Supply & switchboard upgrades

Power Supply & Switchboard Upgrades in Singapore

Adding an EV charger, aircon, a new kitchen or machinery and running out of power? BSH upgrades electrical supply and switchboards for homes, commercial and industrial premises — from single-to-three-phase conversion to main-switchboard replacement and ACB/MCCB changeout — coordinated with the utility and endorsed by a Grade 8 Licensed Electrical Worker.

Single → 3-phase Grade 8 LEW — up to 150 kVA SP supply application handled Wired to SS 638
150 kVA
Load approval
Grade 8
LEW
789+
Projects
1993
Established

Supply and switchboard works we handle

Load & supply assessment

We work out the load you actually need and whether your incoming supply and board can take it.

Single → three-phase

Convert from single-phase to three-phase supply for EV chargers, aircon, kitchens and machinery.

Distribution board upgrade

Replace ageing consumer units and DBs with modern, RCD-protected boards with spare ways for the future.

Main switchboard (MSB)

Design, build and replace MSBs and sub-switchboards for commercial and industrial premises.

ACB / MCCB & ATS changeout

Replace ageing air and moulded-case circuit breakers and automatic transfer switches — often overnight.

Supply application

Apply for and coordinate the supply change with SP Group or the landlord on your behalf.

Get a price before you call

Scope your job with our free tools and get an indicative price in minutes — no obligation.

How an upgrade runs

1

Load study

Site visit and load assessment to size the supply, board and protection.

2

Quote & coordinate

Transparent quote, then we coordinate the supply change with SP / landlord.

3

Changeout

Installation and changeout by a Grade 8 LEW, phased or after-hours to limit downtime.

4

Test, certify & EMA

Testing, certification and EMA endorsement, then handover.

Switchboard changeouts on live, critical sites

BSH carries out supply and switchboard upgrades from landed homes to critical infrastructure — including an overnight ACB/MCCB changeout for the Health Promotion Board and a 2×1600A automatic transfer switch replacement for the Ministry of Foreign Affairs, both delivered with minimal disruption to live operations.

Health Promotion BoardMinistry of Foreign AffairsLanded homesIndustrial premises

Frequently asked questions

How much does a single-to-three-phase upgrade cost?

It depends on the load you need, the cable run and the board. We assess on site, coordinate the supply change with SP Group, and give you a fixed quote before work starts.

Can you change the switchboard without shutting the building down?

We plan most changeouts in phases or after hours — including overnight works — to limit downtime. Some essential outage is usually needed, and we schedule it with you.

Do I need a Licensed Electrical Worker for this?

Yes. Supply and switchboard work is carried out by our trained team under the supervision of, and certified by, a Licensed Electrical Worker. Our Grade 8 LEW also handles the SP application and EMA endorsement.

I want an EV charger but my supply is full — can you help?

Yes. Older landed homes in particular often need a supply or DB upgrade before an EV charger. We assess this as part of our EV charger service.

How long does it take?

A consumer-unit or DB swap can be a day; full supply upgrades depend on SP Group's lead time, which we manage for you.

Need more power?

Tell us what you're adding and we'll size and quote the supply or switchboard upgrade.

Call WhatsApp Get Quote