Supply & switchboard upgrades
Power Supply & Switchboard Upgrades in Singapore
Out of power for an EV charger, aircon or machinery? Three-phase and switchboard upgrades, LEW-endorsed.

Supply and switchboard works we handle
Load & supply assessment
Whether your supply and board can take it.
Single → three-phase
For EV chargers, aircon, kitchens and machinery.
Distribution board upgrade
RCD-protected, with spare ways.
Main switchboard (MSB)
MSBs and sub-boards, designed and replaced.
ACB / MCCB & ATS changeout
Ageing ACBs, MCCBs and ATSs replaced, often overnight.
Supply application
We apply to SP Group or the landlord.
Our work
Photographs from BSH installations — not stock images.


Will your supply take what you are adding?
Most homes run on single-phase: 230 V, 100 A, about 23 kVA. Tap what you run to see if you need more.
white line = 23 kVA single-phase ceiling
Tap a few and see where you land.
Indicative only: a real load check is diversified to SS 638, and your LEW does it before we quote.
Get a price before you call
An indicative price in minutes, free.
How an upgrade runs
- 1Load studySizes the supply, board and protection.
- 2Quote & coordinateA clear quote; we coordinate with SP.
- 3ChangeoutBy a Grade 8 LEW, after hours.
- 4Test, certify & EMACertified and EMA-endorsed, then handed over.
Switchboard changeouts on live, critical sites
Done with our switchgear partner, with minimal disruption to live operations.
Frequently asked questions
How much does a single-to-three-phase upgrade cost?
It depends on the load you need, the cable run and the board. We assess on site, coordinate the supply change with SP Group, and give you a fixed quote before work starts.
Can you change the switchboard without shutting the building down?
We plan most changeouts in phases or after hours — including overnight works — to limit downtime. Some essential outage is usually needed, and we schedule it with you.
Do I need a Licensed Electrical Worker for this?
Yes. Supply and switchboard work is carried out by our trained team under the supervision of, and certified by, a Licensed Electrical Worker. Our Grade 8 LEW also handles the SP application and EMA endorsement.
I want an EV charger but my supply is full — can you help?
Yes. Older landed homes in particular often need a supply or DB upgrade before an EV charger. We assess this as part of our EV charger service.
How long does it take?
A consumer-unit or DB swap can be a day; full supply upgrades depend on SP Group's lead time, which we manage for you.