Supply & switchboard upgrades

Power Supply & Switchboard Upgrades in Singapore

Out of power for an EV charger, aircon or machinery? Three-phase and switchboard upgrades, LEW-endorsed.

Single → 3-phase Grade 8 LEW — up to 150 kVA SP supply application handled
Wall-mounted distribution boards with metering and black cable runs entering overhead trunking.
Boards and containment complete, 400 V labelled.
150 kVA
Load approval
Grade 8
LEW
1,000+
Projects
1993
Established

Supply and switchboard works we handle

Load & supply assessment

Whether your supply and board can take it.

Single → three-phase

For EV chargers, aircon, kitchens and machinery.

Distribution board upgrade

RCD-protected, with spare ways.

Main switchboard (MSB)

MSBs and sub-boards, designed and replaced.

ACB / MCCB & ATS changeout

Ageing ACBs, MCCBs and ATSs replaced, often overnight.

Supply application

We apply to SP Group or the landlord.

Our work

Photographs from BSH installations — not stock images.

LV switchboard lineup with cubicle doors, one open showing internal busbar and breaker arrangement.
An LV switchboard line-up at second fix.
Switchboard installation with 400V danger labelling and safety signage during second fix.
A switchboard, labelled before energisation.

Will your supply take what you are adding?

Most homes run on single-phase: 230 V, 100 A, about 23 kVA. Tap what you run to see if you need more.

0.0 kW

white line = 23 kVA single-phase ceiling

Tap a few and see where you land.

Indicative only: a real load check is diversified to SS 638, and your LEW does it before we quote.

How an upgrade runs

  1. 1Load studySizes the supply, board and protection.
  2. 2Quote & coordinateA clear quote; we coordinate with SP.
  3. 3ChangeoutBy a Grade 8 LEW, after hours.
  4. 4Test, certify & EMACertified and EMA-endorsed, then handed over.

Switchboard changeouts on live, critical sites

3,200 A
air circuit breakers changed overnight for a statutory board

Done with our switchgear partner, with minimal disruption to live operations.

Government & statutory boardsLanded homesIndustrial premises

Frequently asked questions

How much does a single-to-three-phase upgrade cost?

It depends on the load you need, the cable run and the board. We assess on site, coordinate the supply change with SP Group, and give you a fixed quote before work starts.

Can you change the switchboard without shutting the building down?

We plan most changeouts in phases or after hours — including overnight works — to limit downtime. Some essential outage is usually needed, and we schedule it with you.

Do I need a Licensed Electrical Worker for this?

Yes. Supply and switchboard work is carried out by our trained team under the supervision of, and certified by, a Licensed Electrical Worker. Our Grade 8 LEW also handles the SP application and EMA endorsement.

I want an EV charger but my supply is full — can you help?

Yes. Older landed homes in particular often need a supply or DB upgrade before an EV charger. We assess this as part of our EV charger service.

How long does it take?

A consumer-unit or DB swap can be a day; full supply upgrades depend on SP Group's lead time, which we manage for you.

Call WhatsApp Get Quote