Electrical Contractor for Lab and Biomedical Fit-Outs
34 jobs in biomedical and R&D buildings, planned around your equipment list.

What a lab fit-out needs from the electrical
Most of it starts from the equipment list, so we ask for it with the layout.
Circuits from the equipment list
Each instrument on its own rated circuit.
Essential and UPS supplies
Freezers and critical analysers on backed-up supplies.
Benches and services
Bench trunking and pendants, set out with the planner.
Lighting for lab work
Over the benches, with controls for 24-hour rooms.
Working to the landlord
Submissions and shutdown windows agreed.
Testing and handover
As-builts, circuit charts, LEW certificate.
Our work
Photographs from BSH installations — not stock images.



How a lab fit-out runs with BSH
- 1Layout and equipment listSend them in; a price within 24–48 hours.
- 2Load and board designLoad schedule, boards and essential supply.
- 3InstallOur own crew, sequenced with the lab furniture.
- 4Test and hand overLEW endorsement and the handover pack.
Send us your drawings
Send the layout, the equipment list and the landlord’s fitting-out guide. We quote within 24–48 hours.
Labs and R&D floors we have wired
Office-and-lab fit-outs (four successive ones for one company), plus periodic inspection and shutdown maintenance on working R&D floors.
Frequently asked questions
Do you work for the lab planner or the fit-out contractor?
Either. Most of our lab work comes through design-and-build and fit-out firms; we price from their drawings and coordinate with the lab furniture supplier.
Can you work while the rest of the building stays in use?
Yes. Connections to the building supply and any shutdown are done in the window the building management agrees, under a method statement and permit-to-work.
What do you need to price a lab fit-out?
The layout, the equipment list with the power data where it is known, and the landlord’s fitting-out guide. Anything not yet drawn is listed as provisional.
Who certifies the installation?
Our own EMA-licensed Electrical Technicians design installations up to 150 kVA, and install, test and maintain installations up to 500 kVA. Above their limits we engage an independent Electrical Engineer as project LEW.