For F&B and retail fit-outs

Electrical Contractor for F&B and Retail Fit-Outs

More than 60 cafés, restaurants and kiosks since 2013, planned around mall rules and your kitchen.

60+ F&B outlets since 2013 Mall submissions prepared Works to the mall’s hours
Electrician in a hard hat working at an open distribution board during second fix.
Second fix: every way labelled.
60+
F&B outlets since 2013
~35
Operators
17
Outlets for one restaurant group
24–48 h
Quote turnaround

What an F&B fit-out needs from the electrical

Most of it is decided by the mall’s fitting-out rules and the kitchen equipment list, so we ask for both with the layout.

Load from the landlord

Allocation checked against your kitchen equipment, early.

Tenant board and metering

Metered the way the building bills.

Kitchen supplies

Three-phase isolators, exhaust supplies, gas-valve interlock.

Mall submissions

The endorsed single-line diagram and permit-to-work.

Emergency lighting and protection

SS 563 and Fire Code; RCDs per SS 638.

Signage and shopfront

On a timer where the mall sets hours.

How an F&B fit-out runs with BSH

  1. 1Layout, equipment list, mall guideSend them in; a quote within 24–48 hours.
  2. 2Load check and submissionLoad checked; the endorsed diagram submitted.
  3. 3Install in the mall’s hoursOur own crew; noisy work in permitted hours.
  4. 4Test, switch on, hand overSwitch-on with the landlord’s LEW; handover pack.

Send us your drawings

Layout, equipment list and mall guide in; a quote within 24–48 hours.

WhatsApp

PDFs or DWGs, straight into the chat.

WhatsApp the drawings →

Email

The set, or a link, to enquiry@bsh.com.sg.

Email the drawings →

Enquiry form

Paste a drawings link; we reply within a business day.

Use the form →

F&B outlets we have wired

60+
cafés, bakeries and kiosks since 2013
17
fit-outs for one restaurant group, at eleven malls and sites

In heartland malls, the CBD, Orchard and at the airport.

Restaurants and kitchensCafés and bakeriesFood kiosksHeartland mallsCBD and Orchard mallsAirport outlets

Frequently asked questions

Do you handle the mall’s submissions?

Yes. We prepare the LEW-endorsed single-line diagram and the documents the mall’s consultants or LEW ask for, and arrange the permit-to-work the building requires. The switch-on itself is done with the landlord’s LEW, and the building’s own consultant and LEW often charge their fees separately.

Can you work within the mall’s hours?

Yes. Each mall sets its own hours for noisy works such as hacking and drilling, and some allow them only at night. We plan the programme around them.

What if the kitchen equipment changes?

Tell us as early as you can. Swapping gas for induction or adding a combi oven changes the three-phase isolators and the load, and extra load is at the landlord’s discretion.

Do you install the gas and exhaust systems?

No. Gas work is done by a licensed gas service worker, and exhaust and air-cleaning systems by their own specialists. We provide their power supplies and wire the interlocks the mall requires.

Who certifies the installation?

Our own EMA-licensed Electrical Technicians design installations up to 150 kVA, and install, test and maintain installations up to 500 kVA. Above their limits we engage an independent Electrical Engineer as project LEW.

Have an F&B or retail fit-out coming up?

Call WhatsApp Get Quote