Landed homes & bungalows
Landed Home Electrical Contractor in Singapore
New builds, rewires and three-phase upgrades for landed homes, signed off by a Grade 8 LEW.
IllustrationElectrical works for landed homes
New-build wiring
First and second fix to SS 638, with spare capacity.
Full rewiring
New circuits, RCDs and a modern consumer unit.
DB & supply upgrades
Single- to three-phase upgrades for bigger loads.
Lighting & smart home
Landscape and feature lighting, DALI or Casambi control.
EV charger
7.4–22 kW, with the paperwork for LTA.
Earthing & lightning protection
For multi-storey landed homes.
A landed home outgrows single-phase quickly
Aircon, induction, a pool pump and an EV charger add up fast. Tap yours.
white line = 23 kVA single-phase ceiling
Tap a few and see where you land.
Indicative only: a real load check is diversified to SS 638, and your LEW does it before we quote.
Get a price before you call
An indicative price in minutes, free.
How we deliver a landed-home project
- 1Site visit & designWe check the supply, then design the scope.
- 2Quote & scheduleA clear quote; parts of the home stay live.
- 3Install by an LEWOur own team, under a Grade 8 LEW.
- 4Test, certify & EMATested, certified, EMA-endorsed where required.
From a single rewire to a whole new home
From EV chargers across landed estates to complete electrical packages for high-end homes, every job wired to SS 638 and signed off by a Grade 8 LEW.
Frequently asked questions
Do I need a licensed electrician to rewire my landed home?
Yes. The hands-on work is done by our trained electricians under the supervision of, and certified by, a Licensed Electrical Worker — that is both a legal requirement and how we keep quality consistent on site. Everything is wired to SS 638.
Can you upgrade my landed home from single-phase to three-phase?
Yes. We assess your load, coordinate the supply upgrade with the utility, and install the new distribution board and protection.
How long does a full rewire take?
It varies with the size of the home and whether it is occupied. We plan the work in phases to keep essential circuits live, and give you a clear programme with the quote.
Can you install an EV charger at the same time?
Yes — we install 7.4, 11 and 22 kW EV chargers, wired to SS 638, and give you the endorsed documents to register with LTA. It is efficient to do this alongside a rewire or DB upgrade. See our EV charger service.
Do you handle the EMA submission for my landed home?
Yes. Where an EMA installation licence or endorsement is required, our LEW handles the submission and certification.